clock menu more-arrow no yes mobile

Condo Construction Frenzy in the Entertainment District

View as Map

If the ever-present cranes, hoardings and street closures weren't enough to give you a hint, here's a handy map to all the condo developments that are currently either under construction or are in pre-construction status in the popular Entertainment District. We count 20 in the relatively-small area bounded by Queen Street to the north, Front Street to the south, University to the east and Spadina to the west. Have we missed any?


What do you think of all the development in the Entertainment District—thumbs up? Thumbs down? Sound off in the comments.

· Toronto's Entertainment District: growth to watch for [Urban Toronto]
· Toronto's building on up [Toronto Sun]
· Curbed Maps archives [Curbed Toronto]
· Entertainment District archives [Curbed Toronto]

Read More
Eater maps are curated by editors and aim to reflect a diversity of neighborhoods, cuisines, and prices. Learn more about our editorial process.

Theatre Park

Copy Link

234 units on 47 storeys. Scheduled for completion in 2015.

Oxford Place

Copy Link

Oxford place will be a huge six-building complex containing condos, a hotel, a casino and retail space. Currently in pre-construction status.

300 Front Street West

Copy Link

Two towers, 49 storeys and 13 storeys. 684 total units. Should be complete later this year.

57 Spadina

Copy Link

370 units in a single 36-storey tower. In pre-construction status.

459 units spread across two buildings (one 20 storeys, one 37 storeys). In pre-construction status.

King Charlotte

Copy Link

A 32-storey tower with 232 units. Currently under construction.

Bisha Hotel and Residences

Copy Link

A 41-storey mixed-use condo/hotel tower. Under construction; should be completed by mid-2015.

24 Mercer

Copy Link

Controversial development that will squeeze a 15-storey tower onto a 26'-wide lot, squatting on top of a 19th-century historic brick home. Still in pre-construction status.

The Mercer

Copy Link

A 33-storey tower containing 415 units. To be completed in 2015.

Tux Condos

Copy Link

A 40-storey tower, with 242 units. Still in pre-construction status.

King Blue Condominiums

Copy Link

Two buildings - one 48 storeys, one 44 - with a whopping 807 units between them. In pre-construction status.

PJ Condos

Copy Link

One 41-storey tower at the corner of Pearl and John streets. In pre-construction status.

The Pinnacle on Adelaide

Copy Link

46 storeys, 564 units. This project should be complete by the end of 2014.

The Bond

Copy Link

A 40-storey tower with 369 units. The Bond will be complete in 2015.

Cinema Tower

Copy Link

444 units, over 43 storeys. This building may have the ugliest front entrance in the city.

Peter Street Condominiums

Copy Link

When it's completed later this year, this 40-storey tower will have 429 units.

87 Peter (formerly Noir)

Copy Link

This 49-storey tower is still in pre-construction status. The project was originally to be called Noir; why the name change?

Tableau Condominiums

Copy Link

Their motto is "I have slender legs and a steely interior". OK then. Tableau will be a 36-storey tower with 410 condo units. Currently under construction.

Picasso Condos

Copy Link

39 storeys with 402 units. Construction is underway.

Smart House

Copy Link

25 storeys of micro-homes, the first development of its kind in Toronto. Currently in pre-construction (and selling well).

Loading comments...

Theatre Park

234 units on 47 storeys. Scheduled for completion in 2015.

Oxford Place

Oxford place will be a huge six-building complex containing condos, a hotel, a casino and retail space. Currently in pre-construction status.

300 Front Street West

Two towers, 49 storeys and 13 storeys. 684 total units. Should be complete later this year.

57 Spadina

370 units in a single 36-storey tower. In pre-construction status.

post

459 units spread across two buildings (one 20 storeys, one 37 storeys). In pre-construction status.

King Charlotte

A 32-storey tower with 232 units. Currently under construction.

Bisha Hotel and Residences

A 41-storey mixed-use condo/hotel tower. Under construction; should be completed by mid-2015.

24 Mercer

Controversial development that will squeeze a 15-storey tower onto a 26'-wide lot, squatting on top of a 19th-century historic brick home. Still in pre-construction status.

The Mercer

A 33-storey tower containing 415 units. To be completed in 2015.

Tux Condos

A 40-storey tower, with 242 units. Still in pre-construction status.

King Blue Condominiums

Two buildings - one 48 storeys, one 44 - with a whopping 807 units between them. In pre-construction status.

PJ Condos

One 41-storey tower at the corner of Pearl and John streets. In pre-construction status.

The Pinnacle on Adelaide

46 storeys, 564 units. This project should be complete by the end of 2014.

The Bond

A 40-storey tower with 369 units. The Bond will be complete in 2015.

Cinema Tower

444 units, over 43 storeys. This building may have the ugliest front entrance in the city.

Peter Street Condominiums

When it's completed later this year, this 40-storey tower will have 429 units.

87 Peter (formerly Noir)

This 49-storey tower is still in pre-construction status. The project was originally to be called Noir; why the name change?

Tableau Condominiums

Their motto is "I have slender legs and a steely interior". OK then. Tableau will be a 36-storey tower with 410 condo units. Currently under construction.

Picasso Condos

39 storeys with 402 units. Construction is underway.

Smart House

25 storeys of micro-homes, the first development of its kind in Toronto. Currently in pre-construction (and selling well).